Draft 2025 Urban Water Management Plan

South East Management Area

discussed in Section 4.1 and summarized in Table 4-1. Currently, there is no groundwater production in the South East Management Area. Future groundwater production could include bringing Well LF-2 online, replacing Well LF-5, and developing two new wells (see Section 16). No projected groundwater production is currently anticipated within the ETWD and city of Orange portions of the South East Management Area. Any future groundwater production will be managed within the sustainable yield of the aquifer system.

4-20 4 -3 Appendix F - 223

BASIN 8-1 ALTERNATIVE 2022 UPDATE

Powered by