Learn more at irwd.com/doing-business/urban-water-management-plan.
Cover | 1 |
Contact Sheet | 2 |
Acronyms Definitions | 3 |
Table of Contents | 8 |
Executive Summary | 13 |
Section 1 | 17 |
Section 1 | Introduction | 17 |
1.1 Urban Water Management Planning Act | 17 |
1.2 Irvine Ranch Water District (IRWD) | 17 |
1.3 Purpose and Importance: IRWD Water Resources Planning | 18 |
1.4 UWMP Organization and Section Summaries | 18 |
Section 2 | 21 |
Section 2 | Plan Preparation | 21 |
2.1 Basis for Preparing a Plan | 21 |
2.2 Public Water Systems | 21 |
2.3 Regional Planning and Regional Alliance | 22 |
2.4 Standardized Tables, Year, and Units of Measurement | 22 |
2.5 Coordination and Outreach | 24 |
Coordination with Wholesale Agencies | 24 |
Coordination with Water Suppliers and the Community | 25 |
Section 3 | 27 |
Section 4 | 37 |
Section 4 | Water Use Characterization | 37 |
4.1 Description of Defined Water Use Sectors | 38 |
4.2 Past, Current, and Projected Water Use by Sector | 39 |
Estimating Future Water Savings | 41 |
Water Use of Lower Income Households | 42 |
Climate Change Considerations on Customer Water Use | 42 |
4.3 Distribution Water System Losses | 43 |
Section 5 | 44 |
Section 5 | SBX7-7 Baselines and Targets | 44 |
5.1 2020 Water Conservation Mandate | 44 |
5.2 Regional Alliance | 45 |
Section 6 | 46 |
Section 7 | 70 |
Section 7 | Water Supply Reliability and ………… Drought Risk Assessment | 70 |
7.1 Constraints on Water Sources Considerations | 70 |
A. Recent IRWD Water Reliability Studies and Evaluations | 71 |
B. Historic Drought Analysis | 73 |
C. Water Supply Reliability Projections | 73 |
IRWD Normal Year Projections | 74 |
IRWD Single Dry Year Projections | 74 |
IRWD Multiple Dry Year Projections | 75 |
7.2 Water Service Reliability Assessment | 77 |
A. Imported Water | 77 |
B. Groundwater Supply | 77 |
7.3 Water Quality | 79 |
Groundwater Quality | 80 |
Other Water Quality Considerations | 80 |
Imported Water Quality | 81 |
7.4 Drought Risk Assessment | 81 |
Drought Risk Assessment Data Inputs and Methods | 82 |
A. Total Water Use (Demands) | 82 |
B. Total Supplies | 83 |
Drought Risk Assessment Conclusions | 84 |
A. Surplus and Shortfall without WSCP Actions | 84 |
B. Planned WSCP Actions | 84 |
Section 8 | 86 |
Section 8 | Water Shortage Contingency Plan | 86 |
8.1 Overview of Water Shortage Contingency Plan | 86 |
8.2 Summary of Sections and Requirements | 87 |
8.3 Copy of DWR Tables | 88 |
8.4 Plan Adoption, Submittal, and Availability | 93 |
Section 9 | 94 |
Section 9 | Demand Management Measures | 94 |
9.1 Demand Management Measure Implementation | 94 |
A. Budget-Based Rate Structure | 95 |
B. Revenue Stability | 95 |
C. Price Signal to Reduce Water Waste | 96 |
D. Rate Structure Results | 96 |
9.2 Water Use Efficiency Programs and Resources | 97 |
A. Programs | 97 |
B. Workshops and Tours | 98 |
C. Public Outreach and Social Media | 98 |
D. Education Programs | 98 |
E. Water Waste Prevention | 99 |
F. Metering | 100 |
G. Distribution System Loss | 101 |
H. Water Efficiency Staffing | 101 |
9.3 California Water Efficiency Partnership | 101 |
Section 10 | 102 |
References | 107 |
Appendices | 110 |
Appendix A- DWR Checklist | 111 |
Appendix B- Reduced Reliance on the Delta | 125 |
Appendix C- Outreach Letters | 148 |
Appendix D- DWR Submittal Tables | 166 |
Appendix E- Water Shortage Contingency Plan | 190 |
Appendix F- Basin 8-1 Alternative | 283 |
basin-8-1-final-draft-2022-alternative-update.pdf | 484 |
FINAL_STAMPED_South East Management Area_Alternative_2022 UPDATE.pdf | 484 |
SE_Mngt_Area_5yr_Rpt_Signed_Cvrpg | 484 |
Appendix G- OC Demand Projection Model TM | 579 |
Appendix H- Resolutions | 655 |
Powered by FlippingBook