2025 Orange County Water Demand Projection Model
The model output does not include projected active water conservation.
4.3 Baseline Sectoral Forecasts This section provides a summary of the baseline demand forecasts by each model sector. The model output does not include projected active water conservation. This section provides a summary of the baseline demand forecasts by each model sector. The baseline scenario results represent a projection of future water demand for Orange County, assuming no additional active conservation .
4.3.1
Forecast Expectations
Figure 4-4 summarizes the Orange County averaged annual demand projections as well as the historical values.
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
Other Demands (AFY) Commercial, Industrial, and Institutional Demand (AFY)
Irrigation Demand (AFY) Multifamily Demand (AFY) Single-family Demand (AFY) Historical
Figure 4-4: Total Orange County Demands
Annual county-wide single-family residential projected water demand values are projected to decrease from 2025 to 2030, then remain relatively constant through 2050. Multifamily residential projected water demand values are projected to steadily increase from 2025 through 2050. This increase is largely driven by rising multifamily housing units over time. CII demands are projected to steadily increase from 2025