Draft 2025 Urban Water Management Plan

2025 Orange County Water Demand Projection Model

Figure 5-1: Flume Quadrants

Each retail agency was matched to the Flume-specific quadrant. Figure 5-22 plots the CMIP6 model runs for the South Coastal Flume quadrant and plots the model results on a temperature-precipitation climate graph with quadrants of dry/warm, wet/warm, dry/cool, and wet/cool.

5-2

Appendix G - 65

Powered by